Huergo
Project
"Proposal of Eng. Luis A. Huergo"
The position of the group leaded by Eng. Luis
A. Huergo was the the new port should be built upon the improvement
of the old domestic port, the Riachuelo. They proposed the improvement
of the Riachuelo, dredging its bed, and improving the piers and
the deposits of the coasts. They also unified the access to the
port through the south channel, adopting a solution of open inner
harbors, built from south to north, land keeping the Riachuelo as
the center of its development. The design of paralell inner harbors,
120 metres wide, and separated with piers of 100 metres, was in
the front line of the city, south of Plaza de Mayo, and this location
allowed it to grow to the north as much as needed, according to
traffic evolution.
As per this plan, its fulfilling in different stages allowed it
to be financed through the own ..............


|